About the project
In 2023 Alocor successfully put into operation a surveillance system on a new production workshop Tableten 4 on the pharmaceutical company TEVA, property of Balkanpharma Dupnitsa AD. Alocor’s actions as a subcontractor in the Automatisation sector include projecting and developing BMS, as well as integrating the system between the new construction building and the already existing ones. Reserved powers for the future expansion have already been considered. 6000 Physical Data Points. – 19 АHUs monitoring and control. – Management of heating/cooling plant. – Cooling plant management of 3 chillers, 1 dry coolers and 1 Closed Circuit Cooler. – Integration of 96 VAV Dampers. – Integration of 24 Fan Coils. – Integration of 1 Purified Water system. – Integration of 1 House Vacuum system. – Integration of 2 Air compression system. – Monitoring of 97 Fire Dampers. – Migration and redesign of existing BMS.
Възложител | Кордеел-България ЕАД | Период на изпълнение | 2022-2023г. | Период на имплементация | 14 месеца | Период на тестове | 60 дни |