Upgrade of existing BMS system, The Mall, Sofia
About the project
In march, 2024, the activities to upgrade the management and monitoring system – BMS, in Hermes Park, The Mall, Sofia, were completed.
One of the largest shopping centers in the country, which has over 240 stores on an area of over 62,000 sq m, took steps to renew the existing BMS system with a new one, and Alocor, as the main contractor, faced many challenges. The main one – in the migration from an existing to a new system without worsening the management of the building resource.
We are proud that we were able to upgrade the automation to guarantee the client:
– Reducing the time to fix problems that arise
– Easy replacement of defective equipment
– Easy and fast system expansion – hardware and software
– Updating to later versions
– Creating backup versions of the software and easy recovery
– Creating a control mode – manual, automatic and schedules for all controllable circuits and equipment that are integrated into the system
– Ability to integrate systems that are not included in the existing BMS
– Change in equipment control logic and optimization to reduce energy consumption
– Sending notifications of critical alarms via e-mail and SMS to the operator
– data export to external systems
[table cols=” , ” data=”Contractor , AP Retail I Ltd, Scope of the Project , BMS
, Location , Sofia City, Type of the Site , MALL